| Equipment Connecting To High Speed Serial Interfaces (HSSI) |
|
Download File |
| Equipment Connecting To Primary Rate ISDN Services |
|
Download File |
| Equipment Connecting To X.21 Services |
|
Download File |
| Equipment Connecting To X.25 Packet Switched Networks |
|
Download File |
| Safety And EMC Requirements Of Radio And Telecommunications Terminal Equipment |
|
Download File |
| NBB Application And Assessment Procedures |
|
Download File |
| Broadcasting (Fees) Regulations |
|
Download File |
| FBO Licence Schedule |
|
Download File |
| FBO Licence |
|
Download File |
| BTA 2005 - 2006 Annual Report |
|
Download File |
| BTA 2008 Annual Report (English) |
|
Download File |
| BTA 2008 Annual Report (Setswana) |
|
Download File |
| BTA 2009 Annual Report (English) |
|
Download File |
| BTA 2009 Annual Report (Setswana) |
|
Download File |
| BTA 2010 Annual Report |
|
Download File |
| Broadband Strategy Phase 2 Report |
|
Download File |
| Communications Regulatory Authority Act 2012 |
|
Download File |
| Addendum To Broadband Strategy Phase 2 Report |
|
Download File |
| Speech By Hon Nonofo Molefhi At The National Broadband ICT Consultation Workshop |
|
Download File |
| Speech By Mr Thari G Pheko, BOCRA CE At The National Broadband ICT Strategy Consultation Workshop |
|
Download File |